![]() The company was engaged to prepare the report as support for International Finance Corporation’s financing of the Serbian wind farm. Falling victim to pickpockets or muggers is a common concern for the global traveler, and a stint in Scotland is certainly not without its risks. Global consultancy firm Mott MacDonald prepared the Environmental and Social Impact Assessment (ESIA) addendum for the project in March 2018. In addition to your US to Scotland power adapter these items will help you on your travels: 1. ![]() GEOING GROUP conducted detailed engineering-geological and geophysical studies for the project between August and November 2014. It will also connect the wind farm to the electricity network. The contract also includes a 25-year premium service agreement for the turbines.Įlnos Group was awarded the balance of plant contract for the project. Nordex Group received a contract to supply the turbines for the Krivaca wind farm in June 2022. Its main function is to stabilize the voltage, that is, to stably introduce the AC (. The transmission lines will have a length of 19.4km each. The power adapter is an interface transfer device, that is, an adaptor. The electricity produced will be transported from the onsite substation to the Neresnica and Veliko Gradiste substations through two new 110kV transmission lines. The wind turbine generators are planned to be installed in three areas, forming a cluster.Įach turbine will have a diameter of 149.1m, swept area of 17,460m² (187,938ft²) and maximum height of 180m.Ī permanent storage building will also be built for the operation and maintenance of wind turbines at the site. The project will feature 22 N149/4.X turbines from the Nordex Group Delta4000 series, which have a generating capacity of 4.8MW each. Internal overhead transmission lines to connect the substation to the turbine clusters will also be built as part of the project. It also includes the development of a cable system for the future connection distribution plant (PRP). ![]() Phase one of the project involves the construction of 13km of roads, the on-site substation and the expansion of the existing substations at Neresnica and Veliko Gradiste. Construction detailsĬonstruction will include 17.2km of access roads, 13.3km of service roads, an underground medium-voltage cable system and installation of transmission line bays at the existing Veliko Gradiste and Neresnica substations. Introducing the Excellence Awards & Rankings 2022Īn earlier plan included the installation of 38 wind turbines.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |